Apply automated testing to project risk

2025-02-28 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > Internet Technology >

Share

Shulou(Shulou.com)06/03 Report--

First of all, you need to be clear about the goal of automated testing, that is, to submit defect reports quickly, shorten developer feedback time to defects, and ensure the entire project process.

For automation itself, if a lot of energy is invested in writing maintenance test code in the early stage, but with little effect, it is likely to greatly affect testers' active participation in automated testing. at the same time, if it can not be adjusted in time in the testing process, it will not only waste valuable testing time, but also weaken the enthusiasm of project members.

In order to solve the above problems, we'd better implement iterative automated testing, find out the key problems from each iteration, and arrange for the relevant members to track and solve them. And then take the next test. In the process of iteration, testers need to record the problems and typical defects encountered in each iteration, think about new testing methods, and so on. Then determine the coverage of the next iteration according to the to-do list.

The specific iterative method can be accomplished by the following steps:

1. Iteration time

Set the controlled time for the iteration in the early stage of the project to grasp the length of the automated test, during which it is best to record the problem in modules or through different types of tests.

two。 Develop a testing strategy

Most projects have corresponding test strategy descriptions in their early test plans, but they still need to be used flexibly in the actual execution of automated tests.

3. Risk identification

When some projects are in the requirements phase, the product informs them of the possible risks. But this is only the risk of product design itself. We may still encounter some unpredictable failures or task interruptions during the testing process. These failures will lead to a lot of waste. In order to avoid or reduce the frequency of such problems, a set of solutions need to be formed in the implementation process to guide the future testing process.

4. Testing needs to focus on specific goals.

Testers can design some small goals for themselves, or set aside some length of time during the testing process to solve a particular problem.

5. Continuous evaluation

During the iteration, you should refer to the records of the last iteration in order to make the most accurate fixes to the automated tests to adapt to the constant updates of the project.

6. Adjust the plan in time

The plan is in a general sense, and the plan is discharged in the early stages of the project to guide each process. However, in case of an emergency, it may not be able to proceed according to the original plan. At this point, testers are required to evaluate and partially refine the plan to bring it in line with the project schedule.

Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.

Views: 0

*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.