Network Security Internet Technology Development Database Servers Mobile Phone Android Software Apple Software Computer Software News IT Information

In addition to Weibo, there is also WeChat

Please pay attention

WeChat public account

Shulou

Loadrunner Controller Settin

2025-04-01 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > Internet Technology >

Share

Shulou(Shulou.com)06/03 Report--

Uncheck the box

2. Run-time Settings

If debugging, it is recommended to check: Extended log-- > Parameter substitution

If it is a pressure test, it is recommended to use the following settings:

3. Thinking time can be ignored when debugging, but when pressure testing, it is recommended to turn on thinking time.

4. When an error occurs, continue

5. Load Generators: you can use ip to Add

Note:

For lr to add windows machines, you need to do the following in advance:

Turn off windows Firewall

Enable Remote Registry, Remote Procedure Call (RPC) service

Management tool-Local Security Policy-Security options-Network access: sharing and security mode of local accounts, changed to "Classic" mode

Add a Linux machine:

6. After inserting a rendezvous point into the script (the nearest principle, which only takes effect for nearby transactions; note that it is placed outside the transaction), reselect the script, and here you can choose Scenario--- > Rendezvous---. Actually, the rendezvous point is not that important.

7. Schedule design strategy

Business: single scenario, mixed scenario (can be one script or multiple scripts)

Growth mode: fast growth, slow growth, incremental mode (the number of concurrency in each round has increased to a certain extent)

If you have interface dependencies, you can choose a group policy (such as posting first, then deleting posts), or, of course, put it in a script without using Group

8. Running

You can increase the number of concurrency without stopping running (for example, a little more to see if the performance inflection point will be reached)

You can select all, and then click Run

9. Precautions in Monitoring

Observe the changing trend of the main chart without limiting a certain point

Focus on important indicators

View lr's log; view the log of the system under test (log level warn&error), focusing on error's and timeout's.

If the pressure is applied during execution, record the time point of the pressure.

Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.

Views: 0

*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.

Share To

Internet Technology

Wechat

© 2024 shulou.com SLNews company. All rights reserved.

12
Report