In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2025-04-03 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >
Share
Shulou(Shulou.com)11/24 Report--
Thanks to CTOnews.com netizen Alejandro86 for the clue delivery! According to CTOnews.com news on October 16, Guangzhou Railway Group recently issued a public announcement on the environmental impact assessment draft of the new Guangzhou East Railway Station to Xintang Station Line 5 and 6, with a total construction period of 5 years.
The main projects include the upgrading and renovation of Guangzhou East Railway Station, which will be rebuilt according to the double-decker depot scheme of "ground + underground through depot". After the transformation, Guangzhou East Railway Station has been upgraded to a high-speed railway station, and the total scale of the depot has 14 platforms, double the size of the current 7 platforms.
Tuyuan Guangzhou Railway CTOnews.com noted that the Guangzhou East Station to Xintang Station Line 56 project is located in Tianhe District, Huangpu District and Zengcheng District of Guangzhou City, running from Guangzhou East Railway Station in the west to Xintang Station in the east, running in parallel with the existing Guangzhou-Shenzhen Railway, and the full-length 30.014km of the main line of the Guangzhou East to Xintang Railway Line.
Related projects include Guangzhou east to Shipai section Guangzhou-Shenzhen Ⅰ, Ⅱ line reconstruction line length 4.647km, Guangzhou east to Shipai section Guangzhou-Shenzhen Ⅲ line diversion line length 4.653km, Guangzhou east to Shipai section Guangzhou-Shenzhen Ⅳ line diversion line length 4.497km, line length 2.682km for reconstruction of lines 1 and 2, and new line length 3.055km for line 3.
Guangzhou East Station and Xintang Station are set up on the whole line, of which Guangzhou East Station is the reconstruction of the existing station, Xintang Station is the station under construction on the Guangzhou-Shantang Railway, and a Huangpu station is reserved in the line.
The depot of Guangzhou East Railway Station has been rebuilt into 14 24 lines, including 8 14 lines in surface yard and 6 10 lines in underground yard. The existing scale is 7 16 lines (including 4 main lines). The main rail transit around Guangzhou East Railway Station are Metro Line 1, Line 3 and Metro Line 11 and Line 18 under construction.
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
"Every 5-10 years, there's a rare product, a really special, very unusual product that's the most un
© 2024 shulou.com SLNews company. All rights reserved.