In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2025-04-13 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >
Share
Shulou(Shulou.com)11/24 Report--
Thanks to CTOnews.com netizens Mr. Air, Thorn_Flower, lovinit for the clue delivery! CTOnews.com, October 6 (Xinhua) Huawei Digital Energy announced that during the National Day holiday, the fully liquid-cooled overcharging station built by Huawei Digital Energy was officially launched in many places along the Sichuan-Tibet South Line and Litang and Aden Highway (Sichuan section).
According to reports, this 318 Sichuan-Tibet super-charged green corridor uses Huawei's all-liquid-cooled overcharge technology, which has the highest elevation and faster charging, and can provide new energy car owners with the charging experience of "a cup of coffee, full charge". At present, these overcharged terminals have been officially launched in the following areas:
Tianquan County Service area overcharge Station
Litang Kangnan Tourism Distribution Center overcharge Station
Sangdui service area overcharge station
These fully liquid-cooled overcharge terminals have the following characteristics:
Maximum output power 600kW, maximum current 600A, known as "one kilometer per second", can provide maximum charging power at the highest altitude.
Full liquid cooling technology can ensure the high reliability of the equipment: in the plateau region, it can withstand high temperature and high humidity, and can prevent dust and corrosion, and adapt to a variety of complex working conditions along the line.
Match "all models": the charging range covers 200V-1000V, and the success rate of a single charge can reach 99%. It can match passenger vehicles such as Tesla, Xiaopeng, ideal and commercial vehicles such as cargo pullers, and can achieve "charging as soon as you come to the car, and charging as you go".
▲ Touyuan "Huawei Digital Energy" official account CTOnews.com previously reported that during the 2023 Huawei China Digital Energy flagship Summit (Guangxi Station) in September this year, Guilin City and Huawei Digital Energy officially launched the Guilin liquid-cooled overcharge demonstration project. According to the plan, in the next 5 years, Guilin will vigorously develop overcharge stations to achieve full coverage.
According to reports, the maximum power of the charging host in the local liquid-cooled overcharge architecture reaches 720kW. Through the "power pooling and power flexible intelligent distribution technology", it supports the flexible configuration of overcharge / fast charging, and the maximum power of the overcharge terminal 600kW, which can achieve "one kilometer per second".
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
"Every 5-10 years, there's a rare product, a really special, very unusual product that's the most un
© 2024 shulou.com SLNews company. All rights reserved.