Network Security Internet Technology Development Database Servers Mobile Phone Android Software Apple Software Computer Software News IT Information

In addition to Weibo, there is also WeChat

Please pay attention

WeChat public account

Shulou

China's first designed cross-sea high-speed railway with a speed of 350 kilometers per hour, Fuzhou-Xiamen high-speed railway begins trial operation.

2025-03-26 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >

Share

Shulou(Shulou.com)11/24 Report--

Thanks to CTOnews.com netizens convi, West window for the delivery of clues about the past! CTOnews.com, August 31 (Xinhua) according to Chinese railway officials, the Fuzhou-Xiamen high-speed railway officially entered the trial phase this morning. The full operation of the Fuzhou-Xiamen high-speed railway has entered a countdown, and it is planned to have the conditions for opening this year.

Operation test is the last important link before the opening of high-speed railway, which refers to the testing of train diagram parameters, fault simulation, emergency rescue drill, driving test according to the diagram and other projects after the joint commissioning and test of high-speed rail, to simulate the official operation status of the line, and to conduct a comprehensive "actual combat" test on the transportation organization, train pick-up and departure, operation density and equipment status of high-speed railway, so as to provide a scientific basis for formal operation.

According to officials, the Fuzhou-Xiamen high-speed railway is China's first cross-sea high-speed rail, the second in Fujian Province / the first at a speed of 350km / h (CTOnews.com Note: "sea-crossing" here refers to the Putian Meizhou Bay Bridge, Quanzhou Bay Bridge, an Bay Bridge, without long-distance sea-crossing section of the new Xiamen / Fuzhou line).

Construction of the Fuzhou-Xiamen high-speed railway began in September 2017, with all the tunnels on the main line in July 2021 and August 2022, starting from Fuzhou in the north, passing through Putian and Quanzhou in the south, Xiamen and Zhangzhou in the south, connecting the Hefu and Wenfu railways in the north and the Xiamen-Shenzhen and Longxia railways in the south, with a total length of 277.42 kilometers.

After opening, the train running time from Fuzhou South Station to Xiamen North Station will be shortened from the current 1 hour and 19 minutes to about 45-50 minutes at the fastest, forming the so-called "one-hour life circle."

Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.

Views: 0

*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.

Share To

IT Information

Wechat

© 2024 shulou.com SLNews company. All rights reserved.

12
Report