Network Security Internet Technology Development Database Servers Mobile Phone Android Software Apple Software Computer Software News IT Information

In addition to Weibo, there is also WeChat

Please pay attention

WeChat public account

Shulou

The Guizhou section of Guinan high-speed railway has entered the stage of operation and trial, and the first high-speed railway in Guizhou and Guangxi to design a speed of 350km per hour

2025-04-05 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >

Share

Shulou(Shulou.com)11/24 Report--

Thanks to CTOnews.com netizens for the delivery of clues about the past. CTOnews.com news on June 26, this morning, the 55311 test train pulled out from Guiyang North Railway Station, marking the end of the joint test of the Guizhou section of the Guinan high-speed railway and officially entering the running test stage.

According to reports, the operation test is mainly through fault simulation, emergency rescue drills, train diagram parameter testing, and driving tests according to the diagram to verify the adaptability of transport organizations of various systems of high-speed railway lines under normal and abnormal conditions, to verify whether the operation organization mode can meet the operational requirements, and to provide a technical basis for improving a scientific and reasonable transportation organization plan.

The Guinan high-speed railway has a total length of 482 kilometers and a maximum design speed of 350 kilometers per hour. It is an important part of China's "eight vertical and eight horizontal" railway network from Baotou to Hainan, and it is also the first high-speed railway with a designed speed of 350 kilometers per hour in Guizhou and Guangxi.

CTOnews.com inquiry found that the new lines include Longlibei, Guiding County, Duyun East, Dushan, Libo, Huanjiang, Hechi West, Yongan Town, du'an, Mashan County, Nanning North, Nanning East and other 12 stations.

After the line is completed and opened to traffic, the train running time from Guiyang to Nanning will be shortened from more than five hours now to about two hours, and will be connected with many high-speed railway lines such as Chenggui, Guiguang, Shanghai and Kunming. It has become a convenient and fast passenger transport channel from Sichuan, Chongqing and Guizhou to Nanning, Beibu Gulf, western Guangdong and Hainan.

It is worth mentioning that the Guinan high-speed railway has implemented closed and quarantined management, and any act of entering the line or intruding into the boundary without permission is illegal, and the railway public security organs will seriously investigate and deal with it in accordance with the law. At the same time, during the test period, the train is running at high speed, people along the line must not watch or stay, do not fly drones, kites and other floating objects near the line, and strictly prohibit any acts that endanger the safety of railway transportation.

Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.

Views: 0

*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.

Share To

IT Information

Wechat

© 2024 shulou.com SLNews company. All rights reserved.

12
Report