In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2025-02-28 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >
Share
Shulou(Shulou.com)11/24 Report--
CTOnews.com April 19, Jiangxi Provincial people's Government website announced the "new Changsha-Ganzhou high-speed railway environmental impact assessment of the second public."
The project, with an estimated investment of 84.623 billion yuan, is scheduled to start in 2023 with a total construction period of 60 months, according to an official announcement. The construction unit of Hunan section is Huai Shaoheng Railway Co., Ltd., and the construction unit of Jiangxi section is Changjiu Intercity Railway Co., Ltd.
The new long-Jiangxi high-speed railway starts from Changsha West Station in Changsha City, Hunan Province, via Liuyang, Shangli and Pingxiang, Luxi, Lianhua, Yongxin, Jinggangshan and Suichuan, and ends at Ganzhou West Railway Station in Ganzhou City, Jiangxi Province. pass through Pingxiang City, Zhuzhou City and Ji'an City.
This railway enters Jiangxi from Jinshan Town, Shangli County, and the Chongqing-Changshu-Yunguixia connection line is set up at the east-west throat of Pingxiang North Station to connect with the Shanghai-Kunming high-speed railway, and the Ganruilong railway is indirectly connected at the eastern end of the Ganxian station, and the tie line is introduced into the Ganzhou West Railway Station. communicate with Changsha through Ganzhou to Shenzhen.
According to the public data collected by CTOnews.com, the total length of the long-Jiangxi high-speed railway, 405.315km (Hunan section 131.842km, Jiangxi section 273.473km), includes 11 stations with designed speed of 350km / h, including Changsha West (excluding), Huanghua Airport, Liuyang, Shangli, Pingxiang North (existing), Luxi South, Lianhua East, Yongxin South, Jinggangshan East, Suichuan, Ganzhou West (existing), Ganzhou North and other stations.
The survey of the long-Jiangxi Railway was completed on April 7 and entered the stage of construction drawing design. The project is an important part of Yuchangxia (Chongqing-Changsha-Xiamen), one of the "eight vertical and eight horizontal" high-speed railway networks in the national medium-and long-term railway network planning.
Long-Jiangxi high-speed railway main technical standard line number of double-line speed target 350km/h minimum curve radius 7000m difficult section 5500 m limited slope 20 ‰, difficult 30 ‰ traction type CRH EMU after the completion of this project, the travel time from Changsha to Ganzhou will be shortened from 4 hours to 1 hour and 50 minutes, Changsha is expected to become one of the largest high-speed rail hubs in the central region.
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
"Every 5-10 years, there's a rare product, a really special, very unusual product that's the most un
© 2024 shulou.com SLNews company. All rights reserved.