Network Security Internet Technology Development Database Servers Mobile Phone Android Software Apple Software Computer Software News IT Information

In addition to Weibo, there is also WeChat

Please pay attention

WeChat public account

Shulou

All the units of Baihetan Hydropower Station have been put into operation for power generation, and the world's largest clean energy corridor has been completed for half a century.

2025-03-04 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >

Share

Shulou(Shulou.com)11/24 Report--

CTOnews.com, December 20, according to the three Gorges Group, 08:50 on December 20, with the formal grid operation of Unit 9, all 16 million kilowatt units of the Baihetan Hydropower Station on the Jinsha River, which is under construction and the second largest installed scale in the world, have been put into operation, marking the comprehensive construction of the world's largest clean energy corridor on the Yangtze River in China.

The six giant cascade hydropower stations (Wudongde, Baihetan, Xiluodu, Xiangjiaba, three Gorges and Gezhouba) built and operated by the three Gorges Group in the mainstream of the Yangtze River have installed 110 hydropower units with a total installed capacity of 71.695 million kilowatts and an average annual generating capacity of 300 billion kilowatt hours, forming the world's largest clean energy corridor spanning 1800 kilometers. It is of great significance to ensure flood control, power generation, shipping, water resources utilization and ecological security in the Yangtze River basin.

CTOnews.com has learned that from the start of construction of the Gezhouba Project, the first dam of the Yangtze River, to the construction of the three Gorges Project, the largest water conservancy project in the world, and then to the full commissioning of the Baihetan Hydropower Station, the construction of the world's largest clean energy corridor spans half a century. Chinese hydropower people persist in self-reliance and innovative development, overcome a series of world-class technical problems, and realize the historic leap of Chinese hydropower from following, running side by side, and then leading the world.

The million kilowatt hydrogenerator set installed in Baihetan Hydropower Station not only ranks first in the world in terms of unit capacity, but also achieves 100% localization. Research and development, manufacturing and installation have led to the upgrading of the whole industry chain of hydropower equipment in China.

After the Baihetan Hydropower Station is fully completed and put into operation, it will become the second largest hydropower station in the world after the three Gorges Hydropower Station, with an average annual generating capacity of 62.443 billion kilowatt hours, which can meet the electricity needs of about 75 million people a year, and can replace about 19.68 million tons of standard coal and reduce carbon dioxide emissions by about 52 million tons.

Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.

Views: 0

*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.

Share To

IT Information

Wechat

© 2024 shulou.com SLNews company. All rights reserved.

12
Report