Network Security Internet Technology Development Database Servers Mobile Phone Android Software Apple Software Computer Software News IT Information

In addition to Weibo, there is also WeChat

Please pay attention

WeChat public account

Shulou

Jing-Tang Jingbin intercity railway begins full-line operation test: top speed 350 km / h

2025-01-15 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >

Share

Shulou(Shulou.com)11/24 Report--

CTOnews.com, November 26, according to CCTV news, with the departure of D6601 test train from Beijing Railway Station at 09:25 on November 26, the Beijing-Tangshan and Beijing-Beichen Intercity Railway has begun the trial phase of full-line operation between Beijing Station and Tangshan Station, Beijing Station and Beichen Station, as well as connecting with the Tianjin-Qinhuangdao High-speed Railway. A test is expected to be carried out between Beijing and Qinhuangdao in the future to prepare for the final opening.

In addition, Tangshan Station, Tianjin Station and Tangshan Train Depot are debugging passenger service facilities such as ticket gates, display screens and waiting seats in Yanjiao (high-speed railway area), Dachang, Xianghe, Baodi, Yutian South, Tangshan, Baodi South and Beichen stations along the route.

CTOnews.com learned that the Beijing-Tangshan intercity railway starts from Beijing City Deputy Central Station and ends at Tangshan Station in Tangshan City, Hebei Province, passing through Tongzhou District of Beijing, Langfang City of Hebei Province, Baodi District of Tianjin City and Tangshan City of Hebei Province. The total length of the line is about 148.7 kilometers, with a designed maximum speed of 350km per hour, with a total of eight stations.

The Jingbin inter-city railway starts from the Beijing-Tang intercity railway Baodi station, and introduces the existing Binhai West Station to the south through Tianjin Baodi District, Wuqing District, Beichen District, Dongli District and Binhai New area. The total length of the main line is about 96 km, with a design speed of 250 km / hour. there are 4 stations on the whole line. the initial construction and opening range is from Baodi Station to Beichen Station, with a line length of 56.2 km.

Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.

Views: 0

*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.

Share To

IT Information

Wechat

© 2024 shulou.com SLNews company. All rights reserved.

12
Report