In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2025-02-14 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >
Share
Shulou(Shulou.com)11/24 Report--
CTOnews.com, November 21, according to the official release of Tianjin Metro, the first phase of Tianjin Metro Line 10 (Yu Tai Station-Yu Dongcheng Station) has been officially put into operation. The mileage of Tianjin rail transit network has increased to 286km, the number of operating stations has increased to 181, and the number of transfer stations has increased to 23.
CTOnews.com learned that the first phase of Tianjin Metro Line 10 starts from Dongcheng Station in Hedong District in the north to Yutai Station in Xiqing District in the south, with a total length of about 21 kilometers, with a total length of 21 stations, passing through Hedong District, Dongli District, Hexi District and Xiqing District along the way to promote the development of Yanglou, Meijiang, Little Haiti, Haihe Liulin "Design Capital", Zhangguizhuang and Taiyang City. Through the three major functional areas, namely, the humanities and commerce ecological zone, the science and technology education ecological zone and the ecological livable development area, it can transfer with seven lines in the future. The opening and operation of Line 10 has effectively alleviated the traffic pressure in the central urban area.
Huanyudao Station is the first intelligent station in Tianjin Metro with visual 3D integrated transportation and management platform as its core. It realizes 21 intelligent functions, such as voice ticket purchase and inquiry, intelligent customer service, intelligent security check, large passenger flow perception, environment perception, one-button switch station, fault management, work order management, visual monitoring, behavior track playback, intelligent dimming, intelligent guidance and so on.
The intelligent operation and maintenance system of Line 10, located in Liyuantou vehicle depot, consists of three parts: crew intelligence management system, vehicle intelligence operation and maintenance system and field information system. It integrates the functions of display of comprehensive information of line and line network, monitoring and early warning of vehicle status, parking location of electric bus track, construction management of section yard, prompt of key information of line, abnormal alarm of driver, etc., to comprehensively monitor the production of crew, line, vehicle and section yard, so as to realize the "one-screen controllability" of line operation and maintenance.
Tianjin Metro Line 10 adopts type B vehicle, the whole vehicle is designed with intelligence, safety, energy saving and beauty as the design concept, the car is decorated with yellow and green as the main color, the appearance of the car body is made of stainless steel without painting, and the body belt is integrated into the wave elements of Haihe River. the whole line is lively and dynamic, and the interior is designed with warm texture, concise and bright.
The train is equipped with battery full-condition self-traction system, radar-assisted collision prevention system, effectively improve operation safety, the car air conditioning adopts heat pump variable frequency air conditioning unit, the design of lateral blowing reduces the direct blowing of cold air to the human body, the plasma air purification device makes the air in the car more fresh, the train is equipped with LCD electronic map display screen, LED light source intelligent dimming technology, the information display is more intuitive, and the interior lighting is more intelligent.
The mobile phone charging function has been added to the train on Line 10 for the first time, and a charging interface has been set up at the connecting position of each carriage, which can meet the charging needs of different interfaces such as type-C and type-A, and enhance the travel experience of passengers.
In order to cooperate with the opening of Tianjin Metro Line 10, Tianjin Rail Transit Network Management Center is located at Longhan Road Station of Line 10 and Bridge Station of Line 9, Friendship South Road Station of Line 10 and Zuojiang Road Station of Line 6, Xiaobailou Station of Line 1 and Xuzhou Road Station of Line 4 to realize the "discount for connecting lines outside the station".
When passengers change routes at Longhan Road Station and No.1 Bridge Station, Friendship South Road Station and Zuojiang Road Station, Xiaobailou Station and Xuzhou Road Station, they can enjoy a concession of 1 yuan less than 1 yuan when they complete the transfer within 30 minutes without changing the bus medium. When the ticket card itself enjoys the discount, it will be charged according to the first reduction of 1 yuan, and then the superimposed discount of the ticket card. One-way tickets and timed tickets do not support this preferential policy.
After the initial operation of the first phase of Tianjin Metro Line 10, the operating time is from 6:00 to 23:50, the first bus of Dongcheng Station of Yu starts at 6:06, the first bus of Dongcheng Station leaves at 6:00, the last bus of Dongcheng Station leaves at 23:12 and the last bus of Dongcheng Station leaves at 22:30. The minimum driving interval is 5 minutes on weekdays and 7 minutes on weekends and holidays.
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
"Every 5-10 years, there's a rare product, a really special, very unusual product that's the most un
© 2024 shulou.com SLNews company. All rights reserved.