In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2025-03-26 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >
Share
Shulou(Shulou.com)11/24 Report--
CTOnews.com, November 10, according to the website of Jilin Energy Bureau, Jilin Energy Bureau has now issued the 14th five-year Plan for Electric Power Development in Jilin Province (hereinafter referred to as "the Plan").
CTOnews.com learned that the Plan puts forward three development goals, including power development goals, power grid development goals and innovation development goals.
In terms of power development goals, we should continue to distribute pumped storage power stations, vigorously develop clean energy power generation projects, and build 1000 million kilowatt clean energy installations to send electricity to the south. We should speed up the upgrading and upgrading of existing generating units, carry out capacity replacement such as old coal-fired power units in an orderly manner, and reasonably promote the construction of supporting and regulatory power sources. Phased progress has been made in the construction of a new power system in which the proportion of new energy is gradually increasing from the three sides of the grid, source and load. It is estimated that in 2025, the province's installed capacity will reach 6187 kilowatts. Among them: the installed capacity of non-fossil energy power generation reached 38.14 million kilowatts, about 2.5 times that of 2020, accounting for 61.7 percent, an increase of 15.7 percentage points.
In terms of the development goal of the power grid, we will promote the development of the UHV DC project in the high-proportion new energy base of "sending electricity from the south", strive to build the backbone of the "two horizontal, three vertical" 500 kV double-loop network, and enhance the ability of "east-west cooperation" in the province. Optimize the allocation of power grid resources and improve the carrying capacity of power grid We will improve the structure of the regional 220 kV power network, unlock the 500 kV and 220 kV electromagnetic ring networks, optimize the regional operation structure, reduce the system short-circuit current, and improve the reliability of power supply. We will initially build a strong and intelligent first-class modern distribution network, significantly improve the power supply guarantee capacity and information level, and efficiently serve the construction of energy Internet.
In terms of innovation and development goals, speed up the implementation of the "3 (park) + 1 (project)" power innovation development goal. Vigorously promote the three "green power" industrial parks in Baicheng, Songyuan and Siping Shuangliao area, effectively reduce electricity prices, attract high-end industries to Jilin and high-end talents to return. Speed up the promotion of the "Fengguang absorption large-scale hydrogen production Project" of "hydrogen driven Jilin", and gradually realize the substitution of renewable energy for hydrogen production and the extension of the industrial chain value chain by relying on the advantages of renewable energy resources and advanced electrolytic water hydrogen production technology. we will promote the complementary and coordinated development of Fengguang and other new energy and hydrogen energy.
In addition, the "Plan" points out that the automobile industry of Jilin Province has a good foundation, and Changchun, the capital of Jilin Province, is also a national pilot city of "ten cities and thousands of vehicles" for new energy vehicles, and the development of electric vehicles is in line with local industrial policies and has better implementation conditions. Actively promote the development of electric vehicles, provide charging infrastructure for large-scale market applications of electric vehicles, reasonably promote the construction of charging stations, and strengthen the publicity of relevant policies and knowledge to mobilize the enthusiasm of the automobile market. At the same time, actively promote the combination of battery replacement and smart grid technology to make the charging controllable and improve the load characteristics to the maximum extent.
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
"Every 5-10 years, there's a rare product, a really special, very unusual product that's the most un
© 2024 shulou.com SLNews company. All rights reserved.