In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2025-02-21 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >
Share
Shulou(Shulou.com)11/24 Report--
Thanks to CTOnews.com netizens for the clue delivery that you can change your name again! CTOnews.com, November 6, according to the release of China Railway, at 10:16 on November 6, the new Wushaoling Tunnel was built between Lanzhou and Wuwei (Lanzhou-Wuwei Section) of Lanzhou-Zhangye Line 34 Railway, which lasted 1226 days, laying a solid foundation for the early completion and opening of Lanzhou-Zhangye Line 3 and 4 Railway.
The construction of the newly-built Lanzhou-Zhang No. 3 and No. 4 railway is divided into two sections: the Lanzhou-Wuwei section and the Wuwei-Zhangye section, of which the construction of the Lanwu section began in June 2019, and the Wuzhang section has now entered the preliminary preparatory stage of the project. The new line in Lanwu section is 174.2 kilometers long and has a design speed of 250km per hour. It is drawn from Zhongchuan Airport Station, passing through Yongdeng West, Tianzhu West, Heisongyi and Gulangbei stations, and finally to Wuwei East Station.
CTOnews.com learned that the new Wushaoling Tunnel is a controlled project of Lanzhang Line 3 and Line 4. It adopts a double-track tunnel design and is basically parallel to the existing Wushaoling extra-long tunnel on Lanxin Railway. With a total length of 17.1 km, it is the longest extra-long tunnel on the whole line.
Wushaoling is located at the southeast end of Lenglongling, the northern branch of the Qilian Mountains, at the intersection of the Loess Plateau, the Qinghai-Tibet Plateau and the Inner Mongolia Plateau. It is the gateway and throat of the Hexi Corridor, the natural pass of the ancient Silk Road and the westernmost end of the East Asian monsoon.
The average elevation of Wushaoling is 3000 meters above sea level, the main peak is 3562 meters above sea level, and the average annual temperature is-2.2 ℃. The construction time in winter is as long as 7 months, with high cold and hypoxia, thin air, large temperature difference between day and night, fragile ecological environment, complex geological and hydrological conditions, and difficult construction.
In order to complete the construction of the new Wushaoling tunnel with high quality and high standards, China Railway Lanzhou Bureau Group Co., Ltd. cooperated with various construction units to keep a close eye on the important construction nodes, optimize the process method, and promote the research on key construction technology and equipment. A number of innovative construction technology and technical projects have been formed.
In the tunnel design and construction, the builders used the advanced scientific research results of soft rock deformation and the positioning of personnel and equipment chips and other technical means to intelligently, visually and dynamically manage and control the key areas, realizing "one hole at a time and forming at one time". Successfully overcome the difficulties of construction.
Lanzhang third and fourth line railway is a major project of the national "medium-and long-term railway network planning". After the full line is completed, the line will become the second high-speed railway channel from Lanzhou to Xinjiang after Lanxin high-speed railway, which will help to improve the layout of high-speed railway network in the western part of Gansu Province and promote the formation of high-speed passenger transport corridor in Hexi Corridor of Gansu Province.
After the line is completed and opened to traffic, Lanzhou to Zhangye will be accessible within three hours, which is of great significance for improving the layout of China's high-speed railway network and promoting the economic and social development of the northwest region. it will become a golden channel to effectively promote regional economic development along the line, speed up the large-scale development of the western region, and promote the high-quality development of "Belt and Road Initiative".
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
"Every 5-10 years, there's a rare product, a really special, very unusual product that's the most un
© 2024 shulou.com SLNews company. All rights reserved.