Network Security Internet Technology Development Database Servers Mobile Phone Android Software Apple Software Computer Software News IT Information

In addition to Weibo, there is also WeChat

Please pay attention

WeChat public account

Shulou

The Huhang section of Hezhou-Hangzhou high-speed railway has passed the preliminary acceptance: the design speed is 350 kilometers per hour.

2025-02-22 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >

Share

Shulou(Shulou.com)11/24 Report--

Thanks to CTOnews.com netizens for the clue delivery that you can change your name again! CTOnews.com, September 6, according to the release of the Yangtze River Delta Railway, on September 5, the Huhang section of the Hezhou-Hangzhou high-speed railway successfully passed the preliminary acceptance committee led by the China State Railway Group Co., Ltd., which is another important node after static and dynamic acceptance, marking another step closer to the formal opening of the Huhang section of the Hezhou-Hangzhou high-speed railway.

The preliminary acceptance Committee agreed that the test indicators of the Huhang section of the Hezhou-Hangzhou high-speed railway meet the requirements of the relevant standards when the EMU runs at a speed of 350 km / h or less, the project meets the design requirements, the quality is qualified, and the acceptance procedures meet the regulations. Agree to pass the preliminary acceptance.

Construction of the Huhang section of the Hezhou-Hangzhou high-speed railway began at the end of 2019, and entered the joint dispatching and testing phase on April 28, 2022. The inspection trains, comprehensive inspection trains and re-linkage train units were successively put on the line, and round-trip inspection tests and full-line pull-through tests were carried out at different speed levels. On July 6, it was transferred to the trial operation stage. The preliminary acceptance passed smoothly, which laid a solid foundation for the follow-up safety assessment and opening operation.

CTOnews.com learned that the Huhang section of the Hezhou-Hangzhou high-speed railway is an important traffic guarantee project for the Hangzhou Asian Games, which is drawn from the existing Huzhou station, through the South Taihu New area, Wuxing District, Deqing County, Yuhang District, Xihu District, Fuyang District and Tonglu County of Hangzhou, and introduced into Tonglu Station of the Hangzhou-Yellow High-speed Railway after crossing the Fuchun River. the new line is about 137.8 kilometers long and the design speed is 350km per hour. Huzhou, Deqing, Hangzhou West, Fuyang West, Tonglu East, Tonglu 6 stations are set up along the line, of which Hangzhou West, Fuyang West and Tonglu East are new stations.

The Huhang section of the Hezhou-Hangzhou high-speed railway is an important node project to build the "Yangtze River Delta on the track". After the project is completed and opened to traffic, it will further improve the one-hour traffic circle in Zhejiang Province and optimize the layout of passenger stations and river-crossing channels in Hangzhou Railway Hub. Providing a strong transport guarantee for the traffic services of the Hangzhou Asian Games is of great significance to promote the economic and social development along the route.

Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.

Views: 0

*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.

Share To

IT Information

Wechat

© 2024 shulou.com SLNews company. All rights reserved.

12
Report