In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2025-03-28 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > Servers >
Share
Shulou(Shulou.com)06/02 Report--
The Laiguangying computer room is located in Beijing Chaolai Science and Technology Park, close to the subway line Laiguangying Station, less than 1 km away from Wangjing, and the traffic is very convenient.
The Laiguangying data center covers an area of 15000 square meters, with 2500 server racks.
With 724 telecom-grade technical support and professional services, it is an excellent choice for all kinds of multinational corporations and large enterprises to use data centers.
Multi-channel optical fiber directly connected multi-line BGP has exclusive bandwidth, and IPv6 and international export bandwidth can be provided.
Construction of computer room with reference to international TIA standard T3 + level high standard
The network is reliable in quality, flexible in management and easy to use.
Architectural Design of Laiguangying data Center
Reinforced concrete frame structure industrial building, four stories, covers an area of 5000 square meters, construction area of 14114 square meters
The floor height is 6.4m, the net height is 5m, the fire resistance is grade one, and the earthquake intensity is 8 degrees.
The ground on the ground floor is 500 mm above the road, and the surrounding environment of the park is comfortable and safe.
The exterior walls are all made of new fireproof and thermal insulation materials, which are in line with the national energy-saving building standards.
56U cabinet, more than the general cabinet 1x3 capacity, 20A power, abundant power
Spatial independence
Customers use the second and third tiers of the data center separately.
High-level security
Equipped with * alarm system, optional installation of biometric access control system.
Real-time Monitoring without Dead Corner
Real-time monitoring and video recording, unsafe factors are found at any time, and monitoring data are retained for not less than 3 months.
Laiguangying data center power guarantee
Two independent 110KV substations: Donghu and Cuigezhuang
Adopt independent circuit (dedicated line) power supply mode
Two-way power supply is introduced into each substation
Set up two physically independent opening and closing stations
Distribution room distributed layout, close to the load
Using one-stage high-efficiency dry-type transformer
Frequency conversion equipment is equipped with harmonic control equipment
Two-way 28200KVA
With the introduction of municipal power, the guarantee of power supply is more than 99.99%.
9 1800KW Caterpillar
Diesel generator with continuous power supply for more than 10 hours
UPS system
2n backup
Fire alarm system of Laiguangying data Center
Installation of fire smoke and temperature detection system in all directions
Installation of very early smoke detection and alarm system VESTA in all computer room modules, power distribution rooms, battery rooms, switching stations and generators
All rooms are equipped with fire emergency phones
Installation of fire alarm buttons (with fire telephone Jack), acousto-optic alarm and fire broadcast in public areas
Fire evacuation signs in all areas use long-life LED lamps and lanterns
Security measures in Laiguang Camp data
An anti-terrorism isolation wall is installed around the building, which can effectively prevent cars.
High-definition cameras without dead corners are installed around the building, unsafe factors can be found at any time.
The passageways of personnel and goods are subject to airport standard security procedures, and dangerous goods are strictly prohibited.
Anyone who goes in and out must apply for an entry and exit certificate, there are two-way gates at the entrances and exits, all doors are provided with access control, and all entrances and exits need to be swiped by card.
Real-time monitoring and video recording of high-definition cameras without dead corners in the interior of the building
Equipment entry and exit needs to be specially labeled and registered.
Unpacking testing of new equipment is carried out in adjacent buildings
Security personnel conduct fire drills every month and can deal with emergencies at any time.
Anyone who goes in and out must apply for an entry and exit certificate, there are two-way gates at the entrances and exits, all doors are provided with access control, and all entrances and exits need to be swiped by card.
Real-time monitoring and video recording of high-definition cameras without dead corners inside and outside the building
Equipment entry and exit needs to be specially labeled and registered.
Security personnel conduct fire drills every month and can deal with emergencies at any time.
Cooling system of computer room in Laiguangying data center
Two physically independent cold stations, the main pipes are interconnected
3: 1 independent chiller system for each cold station, including independent transformer, cooling water pump, chilled water pump, cooling tower and plate heat exchanger
Using natural cooling design, all-natural cooling and semi-natural cooling time more than 7 months
Frequency conversion chillers and cold storage tanks solve the problems of surge and power outage restart of refrigerators
The cooling pool of 1200 cubic meters can run for 36 hours at full load after the water is cut off.
Annular pipe design can repair and replace any pipe fittings and equipment online.
Precision air conditioners adopt Numb2 design to reduce the number of valves
The control system of intelligent cold station automatically switches different operating conditions.
Cold passage closure design
Independent humidification and dehumidification design
Welcome to consult!
IDC Liu Gengxing
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
"Every 5-10 years, there's a rare product, a really special, very unusual product that's the most un
© 2024 shulou.com SLNews company. All rights reserved.