In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2025-02-23 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > Internet Technology >
Share
Shulou(Shulou.com)06/02 Report--
How to use keystrokes in orCAD to achieve Repeat function, in view of this problem, this article introduces the corresponding analysis and solution in detail, hoping to help more partners who want to solve this problem to find a more simple and easy way.
1. Introduce the reasons
Under orCAD, especially in the case of "bus" and "neat connection", there are many lines that need to be stretched. If you use "pull wire one by one", it will take a lot of time. At this time, you can use the Repeat method provided by the system to realize fast cable pulling.
2. Example case 1-neat connection
Under orCAD, if two devices present a "neat connection", as shown in the following figure, you can use "stretch after assembly".
First, as shown in the following figure:
Then, splice:
Finally, stretch any one to the appropriate position, as follows:
As shown in the above figure, the "effective connection" of "20 finished lines" can be completed in an instant.
3. Example case 2-bus connection
Under orCAD, especially in the "bus" part, there are many problems.
Contains at least four attributes: "bus", "bus label", "bus entry", and "bus connection"
Examples are as follows:
As shown in the figure above: "1" is "bus"; "2" is "bus label"; "3" is "bus entrance"; "4" is "bus connection"
Step 1:
After deleting "bus connection", select "bus Portal" and press "Ctrl+ left mouse button" to drag down to automatically "copy bus Portal"
Then, press the "F4" key to realize "Repeat to place the bus entrance"
PS: you must make sure that the "bus entry" is "selected"
Step 2:
First, connect the first wire, as follows:
Then, press the "Ctrl+ left mouse button" to drag down to automatically "copy the bus cable":
Finally, press the "F4" key to realize "Repeat placing bus connection"
PS: you must make sure that the "bus connection" is "selected"
4. Special usage
The core content consists of three steps: first, "place the first one after"; then, use the "Ctrl+ left mouse button"; finally, cooperate with "F4" to achieve "Repeat"
It can realize "Repeat placement" for the combination of "network label + network connection" at the same time.
The end result is:
This is the answer to the question about how to use buttons to achieve Repeat function in orCAD. I hope the above content can be of some help to you. If you still have a lot of doubts to be solved, you can follow the industry information channel to learn more about it.
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
"Every 5-10 years, there's a rare product, a really special, very unusual product that's the most un
© 2024 shulou.com SLNews company. All rights reserved.