Network Security Internet Technology Development Database Servers Mobile Phone Android Software Apple Software Computer Software News IT Information

In addition to Weibo, there is also WeChat

Please pay attention

WeChat public account

Shulou

SAP long-term simulation plan

2025-03-28 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > Internet Technology >

Share

Shulou(Shulou.com)06/03 Report--

SAP long-term simulation plan

D project, the author has participated in the design of a report called supplier forecast, the specific logic is to grab the number of open in PR, and then monthly summary display in the report. Project D customers believe that this logic is not comprehensive because it does not take into account the data from budget planning, the long-term simulation plan. The author is not a PP consultant. I feel a little dizzy when I hear what they say about budget planning. In order to support the needs of customers, I have to do some research and study on the long-term simulation plan of SAP. After consulting the relevant materials, the following words are sorted out.

A, related transaction code list

MS00 long-term Plan

MS01 long-term planned operation, summary by factory operation

MS02 runs by material

MS03 runs at a single level by material

MS04 long-term simulation plan, inventory / demand list

MS05 displays a list of simulation requirements

MS06 summarizes the list of requirements

MS07 long-term plan, material list

MS08 MRP list of long-term plans for restructuring

MS11-13 create-modify-display simulation schedule

MS20-21 Plan document input: long-term Plan

MS22 sets up the plan file for the solution

MS23 deletes the plan file for the scheme

Initial inventory simulated by MS29 calculation

MS31-33 create Plan Plan-modify-display

MS44's long-term plan for flexible valuation

MS47 evaluates LTP to the product group

MS50 activates production planning

MS51 LTP project plan

MSAB Settings Plan File Import

MSAC delete schedule file input

MSBT long-term planning, automatic operation

MSE7 EKS simulation, material selection

MSLD print long-term Plan

MS64 creates a simulation version

MS65 requirements scenario

Requirements related to MS66 copy simulation

B, long-term plan description

The long-term plan is to simulate the MPS plan. First, create a plan plan, specify the corresponding plan version and factory, and then use MD61 to create the corresponding simulation independent requirements. The plan version can be converted from SOP, which is equivalent to simulating and evaluating the plan results produced by SOP. Follow-up run the simulation plan, evaluate the material requirements plan and capacity plan, after the evaluation, if it is feasible, then use MS64 to copy into the formal plan version, and carry out the normal MPS process.

1. Create a separate requirement, not an inactive version of 00, which can be split into DWM detailed date plans in the planning line project (MD61-63 md73).

2. Long-term planning is a kind of simulated MRP. According to the customer's demand during the production period / different versions of the plan, different planning schemes are used to simulate MRP to evaluate its impact on enterprise resources (inventory materials / capacity) and to evaluate the feasibility of planning or adjustment. It is mainly reflected in the following three aspects:

1) Simulation environment: share the relevant master data with the formal system, and the simulation plan environment does not affect the formal plan data.

2) demand sources: you can customize the demand sources-which version of PIR (independent requirements), whether to consider sales order requirements, and so on.

3) supply: custom supply elements, whether to consider initial inventory, purchase orders, production orders and so on as supply.

Planning scheme: the long-term plan compiles the settings of various operating parameters through the planning scheme, and multiple planning schemes can be defined to compare various schemes.

3. Create a plan scheme MS31

Modify the MS32 of the plan, which can only be modified by canceling the release before the modification.

View the plan scenario MS33.

Run a long-term plan

MS01 runs by factory

MS02 runs by material and specifies the multi-level long-term plan of the specified material in the factory.

MS03 one-way long-term plan for designated materials in designated factories

Result query

MS04 dynamic real-time demand list query

MS05 classification query

Planned simulation adjustment

Re-adjust the planned independent requirements according to the results of MS04/MS05, re-run the production schedule, after evaluation and adjustment, if there is no problem with material conditions, scheduling time, etc., the independent requirements can be copied as the active version for official use. (look at the planned start date of the MS04's resulting schedule and the supply of components to determine the independent demand, and if the demand can be met, the simulated independent demand can be copied to the official version MD64).

2018-06-19 arrangement and Changning District, Shanghai

Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.

Views: 0

*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.

Share To

Internet Technology

Wechat

© 2024 shulou.com SLNews company. All rights reserved.

12
Report