In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2025-02-22 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > Internet Technology >
Share
Shulou(Shulou.com)06/02 Report--
When I was traveling in Switzerland, I was very curious about one thing.
This is it
How can the trams in the old city of Bern, the capital of Switzerland, calculate the time so on time? Because after all, there will be all kinds of uncertainties, such as passers-by crossing the road and red street lights, as well as aging asset management equipment. So big data still stood under the station sign and waited for 10 minutes to check whether the bus came on time. The answer is: get there on time!
Not only in Switzerland, but in Australia, a country full of kangaroos and koalas, there is also a tram network called Yarra Trams, which is the largest tram network in the world. It has 250km double-decker tracks, 29 routes and 487trams, and transports 190 million passengers at 1763 tram stops every year.
If you have a big business, the difficulty of management will rise to countless levels. Yarra Trams has been seeking to maximize the effectiveness of its on-site maintenance resources while maintaining timely and quality service.
Yarra Trams implements a comprehensive asset management IBM solution that captures asset status data through mobile devices. These data reveal wear and tear and provide other insights to form new maintenance procedures and support engineers to repair or repair high-risk assets before a failure occurs. In the future, it will be able to use asset-mounted sensors on new trams.
Yarra Trams's service delivery rate is 98.92%, which exceeds the Yarra Trams98% target by about one percentage point. The solution also contributes greatly to the punctuality of Yarra Trams, with a punctuality rate of 84 per cent exceeding the government's target by a full seven percentage points. In addition, in terms of improving network uptime, the solution improves employee productivity by reducing the time between network problem detection and work order creation and dispatch.
Not only the tram field on the road, but also the underground subway in the city needs to ensure its punctuality and optimal asset management. More than a decade ago, when London Underground (Tube Lines) took over the maintenance and upgrading of the entire infrastructure of the Jubilee, Northern and Piccadilly lines, they found that the line asset information was spread over about 500 completely different systems and 1500 Excel spreadsheets. It's sour to think about it. Tube Lines uses a solution to improve the asset management system and better monitor every asset information.
What exactly is the solution used by Yarra Trams and TubeLines? It is IBM Maximo, which optimizes the availability and reliability of asset management.
Want to know more? (you can get more information through the following channels)
1. Welcome to scan the QR code below and follow the official Wechat account of "IBM big data and Analysis".
2. You can learn more about it by searching "practice big data".
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
"Every 5-10 years, there's a rare product, a really special, very unusual product that's the most un
© 2024 shulou.com SLNews company. All rights reserved.