Network Security Internet Technology Development Database Servers Mobile Phone Android Software Apple Software Computer Software News IT Information

In addition to Weibo, there is also WeChat

Please pay attention

WeChat public account

Shulou

Project Management system for Automotive Electronic Test-TPA

2025-01-19 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > Internet Technology >

Share

Shulou(Shulou.com)06/02 Report--

Overview

INTEWORK-TPA (Test Project Administrator, hereinafter referred to as TPA) is an integrated test project management tool, which can manage all data during testing, including requirements, use cases, samples, plans, reports, defects, etc. Traditional management methods are generally based on multiple software, mostly based on the management of a single process, lack of rigorous management ideas and process tracking. As an integrated solution of test project management, TPA pays more attention to test project process management, tracking and covering each process effectively in a system.

Product introduction

Test requirements management

The project management of TPA takes requirements as the core and supports viewing statistical information based on requirements, such as requirements coverage, implementation of corresponding use cases and defects in application case tests.

♦ supports the import of testing requirements for third-party tools

♦ supports correlation between test requirements and test cases, plans, defects, and reports

Powerful data statistics function of ♦

Test plan management

Each test plan can specify information such as the start and end time, the person in charge, and the test cases to be executed. At the same time, by providing perfect statistical functions, project managers can directly view the status of project plan implementation, help users reduce tedious statistical work, and devote more energy to project management.

♦ supports the establishment of test case development plan and test case execution plan

♦ supports tracking the completion of different types of test plans

♦ supports importing automated test plans into TAE execution

♦ supports manual test plan export

Test case management

Test cases are managed hierarchically by creating new packages at different levels or directly inheriting the hierarchical structure in the requirements management module. The tree structure and use case information in this module can be directly imported into TAE software for the construction of subsequent test sequences.

♦ tree hierarchical use case management, which can be divided into three levels: project, package and test case, supports LTC/CTC structure and effectively reduces the number of test cases.

The variables in ♦ test cases come from the variable management module to ensure the consistency of variables.

♦ supports tracking and coverage analysis of test requirements by use cases

Unified management of variables and variable values in ♦

♦ supports automatic replacement of referenced use cases when variables and values are updated

Test sample management

In general, the test samples are upgraded and changed gradually during the testing process, and the test results of the same use case running under different test samples may be different. in order to ensure the accuracy and correspondence of the test results of the specified samples, TPA provides the test sample management function, and the information of the test samples will be completely saved in the test report.

♦ unified management test sample

♦ supports the associated management of test plans, test reports, defects and test samples

♦ provides statistical functions based on test samples.

Test report management

Users can upload manual (real vehicle, bench, etc.) test reports and automatic test reports to TPA for unified management, and support statistics and analysis of test results and use case execution based on existing test reports. All test reports can be viewed and exported online.

♦ supports manual and automatic report uploading, viewing and downloading

♦ supports statistics based on test reports

♦ supports test coverage statistics for test cases

Defect management

Defects are the core output of the whole testing activity, and defect generation and closure is the process of finding and solving problems in testing activities. TPA provides a complete defect management module, which is associated with the data of requirements, use cases and other management modules.

♦ supports the input and export of software defects

♦ supports the association of defects with requirements, use cases, and reports

♦ supports defect statistics in various dimensions.

Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.

Views: 0

*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.

Share To

Internet Technology

Wechat

© 2024 shulou.com SLNews company. All rights reserved.

12
Report