In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2025-02-28 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > Servers >
Share
Shulou(Shulou.com)06/02 Report--
In this issue, the editor will bring you about the equipment needed for the construction of the CVM computer room. The article is rich in content and analyzes and describes for you from a professional point of view. I hope you can get something after reading this article.
The data room of the cloud server is a multi-functional and multi-professional system engineering. In addition to all kinds of equipment of the electronic computer system, there are all kinds of environmental protection equipment, and reasonable planning of equipment layout is needed.
Equipment needed for the construction of CVM computer room
Computing mainframe, storage equipment, server cabinets and UPS, air conditioners, cables, row cabinets, optical fiber, secondary network switching equipment, air filters, exhaust fans, air ducts, motors, heat engines and other equipment.
In the security system, air-conditioning system, power security, fire protection system have to do enough work, there are relevant emergency mechanisms, can effectively ensure the stable operation of the server for a long time.
Matters needing attention in the construction of CVM computer room
The mainframe, storage equipment, server cabinet should be arranged in different areas, and the mainframe, storage equipment, server cabinet, UPS, air conditioner and other equipment should set aside the maintenance space according to the product requirements, allowing the maintenance spacing of the adjacent equipment to overlap.
To rationally regulate the equipment entering the CVM room in stages and to reserve the relative position of the expansion equipment should not only conform to the technological process of the computer system, but also facilitate the entry of the expansion equipment and the connection of cables in the future.
Within the effective air supply distance of the precision air conditioner in the computer room, the air supply direction should be consistent with the arrangement direction of the equipment; when using the under-floor air supply mode, the air supply direction of the air conditioner should be consistent with the direction of the strong and weak wire slots under the floor.
In addition, there are many equipment and matters needing attention for the construction of CVM room. Therefore, the construction of the computer room is a huge and tedious project, it is better to directly choose the server to rent or trust convenient and save money.
The above is what equipment is needed for the construction of the CVM computer room shared by the editor. If you happen to have similar doubts, please refer to the above analysis to understand. If you want to know more about it, you are welcome to follow the industry information channel.
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
"Every 5-10 years, there's a rare product, a really special, very unusual product that's the most un
© 2024 shulou.com SLNews company. All rights reserved.