In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2025-01-28 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > Network Security >
Share
Shulou(Shulou.com)06/01 Report--
Data Center Level: Tier-4 Consultation Tel: 400-720-7200 Power Support: Two-way mains and UPS Power Supply Guarantee Output Bandwidth: Telecom 120Gbps/New Unicom 20Gbps Service Support: 7X24 hours a year service support, real all-day resident engineers, real-time detailed network monitoring Data Center Address: Wuxi International Data Center is located at No. 88 Jinghui East Road, Taihu New Town, Wuxi City, Jiangsu Province. It is the highest level data center of China Telecom in Jiangsu Province. The entire data center was built to Tier4, the highest level of industry standards. It has China Telecom's export bandwidth of 120Gbps and New Unicom's export bandwidth of 20Gbps. The first phase of the data center can provide 657 standard racks and 16000KVA power supply, mainly for the Internet industry, online games, video and other large bandwidth demand users to provide extremely high infrastructure and resource cost performance, at the same time for enterprise business disaster recovery, portal is also a good cost-effective choice. Data Center Features Infrastructure Independent data center building, resistant to earthquake of magnitude 8, strong storm and lightning strike Total building area: 70,000 square meters Phase I hosting area: 3,300 square meters Maximum floor load: 1,200 kg Air conditioning system Carrier's water-cooled unit host system Honor level: 2 (N+1) Upper exhaust, lower supply of ℃ air design, separation of hot and cold channels Temperature control range: 21~25°C Air humidity range: 40%~55% equipped with (N+1) redundant water-cooled equipment fire fighting system automatic manual gas fire extinguishing system environmental protection fire extinguishing gas (IG541) managed area fire prevention electrostatic isolation building materials fire fighting system weekly inspection, monthly drill safety 7x24 hours professional security guard and patrol strict access personnel supervision and certificate review magnetic card two-way access, record retention 7x24 hours video surveillance Video Save January Power system 1600 KVA x 2 dual mains connection Phase I equipped with 4 sets of 400KVA UPS units (2+1) UPS power supply time more than 30 minutes 400KWx4+1 diesel generators, 250 square meters oil depot, 48 hours of oil storage Gas station priority fuel supply agreement to ensure that generators weekly inspection, Monthly drill 99.99% continuous power supply guaranteed network access 120Gbps access China Telecom backbone network 20Gbps access China Unicom backbone network Annex: down.51cto.com/data/2360661
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
"Every 5-10 years, there's a rare product, a really special, very unusual product that's the most un
© 2024 shulou.com SLNews company. All rights reserved.